Tuesday, June 1, 2010

Final Rendered Images



A rendered image of the bicycle sharing system set up with the locking device and the information kiosk pole. Can be placed around areas explored in the esquisse's and discussed in the blog.



Completed storyboard of how the actual system works. Runs from intially finding the areas to paying for the system and then taking the bike and helmet out of the locking device. Simple, clear and easy to read and work out.



A section cut of the pole assembly where the seat can be adjusted easily to allow for the different users. For example the elderly ranging through to students.



A two part perspective of the casing and then the internals of the component. Is set up clear and with plenty of room for adjustment. The clamp handle is made at a certain length to reduce the intensity for the elderly straining their hands.



The LCD screen protective anti theft security measures.



A rear opaque look of the bicycle entering into the infrastructure. With the components identifiable in red.



A rear perspective view of the bicycle and integral components. Ie: rear hub bearing assembly and shafts.



Helmet assembly position. The clips are magnetized and work in uni sense with the LCD control screen to allow for the helmet to be unclipped and clipped at any time during use.



Handle bars and area of payment. Located directly at the front of the bicycle.



Rear perspective render of the unit and bicycle together.



Dual bicycle perspective. Locking devices are portable and can be moved and set up in areas around the inner Melbourne city scope.


Locking device elevation views.


The hubless bicycle utilises regenerative powering to source the power for the lcd screen and the lights.



Rear fender with adjustment controls.



Security measure for the LCD screen. Can be opened to allow for maintainence and replacement.


Front fork lights. Easily interchangeable. Run off a small current. Located at the bottom of the front forks and at the rear of the swingarm behind the tyre.



Locking device see through to gain an understanding of the components and how the bicycle is slid into position, thus locking the station via the solenoids.



Part left of the assembly of the device. Inside lies the components which control the locking of the rear bearing to the device and then in turn to the ground.


Side elevation of the locking device and location of components.


Collaboration of locking devices and certain perspectives to understand how the system works.


Side elevation including detail into how the front bearing system and fork actually work.

Top and front elevations to grasp an idea of how big the bicycle is and how it can be suited for the residents of Melbourne and travellers.



Information kiosk pole located throughout the Melbourne vicinity.

Final helmet design. Brass rivets. Anti-bacterial lotus leaf plastic. Magnetised locking clips. Cloth straps & inner pads to allow for comfort.


Bicycle units at a hub station. This is a general setup of how the system could be handled. As its portable it has the ability to become portable and can become modular.


In context next to a standard person size to gain a look into the size of the bicycle against its user.

Development to final outcome process. According to our folio we have generated significant concepts and refinement which inevitably through dot design into its final selection of a bicycle.


Standard sourced clamping components will be used on the mudguards and seat adjustment controls.


Simple render of how the chain mechanism works with the idler and female gears showing the path of the chain.



The internal components of the frame. Dual gear drive systems, pedal assembly and hub positions can all be clearly identifiable.



Side elevation of the chosen bicycle in context with the locking device.



A typical set up of how the bicycle sharing scheme can be set up and used throughout Melbourne.



The tyre of the bicycle rolling onto the optical ramp located within the locking device.

Saturday, May 29, 2010

Some progress renders.



University hub locations.



Public transport hub locations.



Tourist hotspots hub locations.



Shopping hub locations.



Located in parks hub locations.

Here are some progress renders of both the bicycle and the locking device as we start to put together a final presentation and move for Tuesdays deadline.



Incorporating the 'finder' bicycle sharing application for iPhone and iPad use. Simple to find and free to use which gives a detailed description of the hub locations throughout the Melbourne CBD.




During installation of the iPhone/iPad application, nb: this can further be used or refined to other states need be in the future.



Warped angle of the final hubless featured bicycle. With helmet stored on the seat to minimise theft, as the 'thief' would look stupid riding around on a helmet!



Another perspective render showing the assembly of the pedals and the rear swingarm which is locked to the rear inner hub.



Just a taste of what is to come on Tuesday!



The locking device itself with two leds situated at the front of the locking device to help guide the bicycle in at night or times of dusk and dim light. The same colours have been used throughout to give the bicycle and the locking device a themed identifacation so that its clear that this belongs to the Melbourne bicycle sharing scheme. These colours also help to deter theft and damage.



The internal componenets which help to lock in the bicycle through the hubless rear front bearing. A solenoid fed pin located on either side powered by a microcomputer which also houses the internals for the optical sensors which trigger the solenoid bar to be released. Decided on having two pins to increase its strength and that if one were to fail there still would be the secondary backup which reduces theft.



Side view of the locking device showing the components held down by a specialised female and male bolt system which is only been created for the maintainence team in charge of the Melbourne bicycle sharing scheme. Note: These cant be bought at Bunnings!!



Rear view of the bicycle housing, the shape easily recognisable and matches well with the bicycle itself having an extrude through the middle to thus help with the aesthetics but also to see the progress of locking and to help light stimulate the base of the plate.



Close render of the controls located on the handlebars. Rear and front brake levers with the cabling reaching their intended brake control. The bell to comply with Australian standards and the front of the handlebars shows the area where the credit card is to be accepted. The levers and rubber grips are easily replaceable and will be seen to be the most damaged item on the bicycle unit itself.




A perspective of the lcd monitor display screen with chrome key lock to let the maintainence officers replace or repair any damaged screens. Again this key is given only to the maintainence team and cannot be purchased at any local hardware shop. The front tyre tread comes out well in this render.




The layout for the front bearing system. The main inner hub is supported by a bearing sleeve on either side which allows the main hub to roll. This is held in place secondarily through the lower set of bearing rollers which fit in underneath to help guide the wheel on a direct path and to help avoid damage from bumps and debris.




The bicycle and its locking device. Has come up well with a great colour scheme used throughout the system. The context use and how it is taken in and out of the unit will be discussed at greater lengths throughout the presentation. The same theme of the 'hole' is used throughout both items tieing them together well.




Front view of the bicycle sharing system with the led clearly displayed on the front tyre. Having the led's low ties it well with the look of the bike and helps prevent cabling issues without having the use of a gyro. All these renders will be further spruced up on photoshop to make sure they are doing the bicycle sharing system justice.



The internal optical ramp for the bicycle as the tyre rolls over the ramp and triggers a sensor the solenoids are told to be released. This is operated via an 'AND' electronic gate, which means only if three or more sensors are covered the solenoid will be released. This prevents things like insects or sticks releasing the solenoid consistently.



Rear view of the adjustable seat unit and the mudguard clamp. The seat can be raised or lowered according to the user so it accomodates for all demographics within the Melbourne city.

Thursday, May 13, 2010

Finished Bicycle Design

After much switching and changing the final bicycle is listed below. More photos to follow shortly!





Thursday, April 29, 2010

In Class Exercise week 7

Following Tuesday's class 'dot design' was given a chance to understand the bicycle concept on a real level sense. This task was productive giving members a sense where change of direction was needed, not only on the frame but also on thickness, size and location of where the important components of a standard bicycle lay.

Refer to below jpeg.


Monday, April 19, 2010

Refinement / Development

Scanning some of my concept boards together collaborated on an A0 style board to see how the bicycle has developed throughout the refinement stages. Toggle through the board to see different ideas and sketches.

Wednesday, April 14, 2010

Further Generation of Ideas

After delivering the 2 concept boards below to the class, according to the teachers my bicycle needs to head in an alternative direction. It does take the feel of a 'aerodrome' style bicycle and isn't really ideal to suit most demographics within Melbourne.

Having a further look and attacking some new concept sketches for Friday's class I came across these two ideas which have further sparked a new direction. Basic sketches will follow some of these bicycles to try and incorporate a new and innovative bicycle which this time can reach most demographics.



This follows a 'bmx' feel and I want to try and incorporate this laid back approach to the upcoming finalised concept. Its simple in design, yet suits all needs within the Melbourne society.

Monday, April 12, 2010

Concept Boards

Our team members comprising of Ben McFadyen, Matthew Bull & Josh Tilley decided on dividing the 6 Concept Boards into 2 each per member. We found that doing this would give a different flare to the bicycle design, infrastructure design and helmet concepts. Shown below is some concepts that I have disected from my concept generation and put together to form 2 bicycle designs.